Go Back   Kampfgruppe Forums > The Depot > SSpoom's Basement

 
We are happy to announce open registration on the KG forums has begun! Welcome everyone!

Reply
Thread Tools Display Modes
  #1  
Unread 09-01-2006, 10:15 AM
KG_AGCent's Avatar
KG_AGCent KG_AGCent is offline
Oberste Befehlshaber (Ret.)
Oberst
 
Join Date: Jan 2005
Location: Doing Laps Around the Beads for You Heathen
Posts: 1,620
Send a message via MSN to KG_AGCent
Default We Are Going Back To The Moon!

RELEASE: 06-305


NASA Selects Orion Crew Exploration Vehicle Prime Contractor

NASA selected Thursday Lockheed Martin Corp., based in Bethesda, Md., as the prime contractor to design, develop, and build Orion, America's spacecraft for a new generation of explorers.

Orion will be capable of transporting four crewmembers for lunar missions and later supporting crew transfers for Mars missions. Orion could also carry up to six crew members to and from the International Space Station.

The first Orion launch with humans onboard is planned for no later than 2014, and for a human moon landing no later than 2020. Orion will form a key element of extending a sustained human presence beyond low-Earth orbit to advance commerce, science and national leadership.

The contract with Lockheed Martin is the conclusion of a two-phase selection process. NASA began working with the two contractor teams, Northrop Grumman/Boeing and Lockheed Martin, in July 2005 to perform concept refinement, trade studies, analysis of requirements and preliminary design options. Lockheed Martin will be responsible for the design, development, testing, and evaluation (DDT&E) of the new spacecraft.

Manufacturing and integration of the vehicle components will take place at contractor facilities across the country. Lockheed Martin will perform the majority of the Orion vehicle engineering work at NASA's Johnson Space Center, Houston, and complete final assembly of the vehicle at the Kennedy Space Center, Fla. All 10 NASA centers will provide technical and engineering support to the Orion project.

The contract is structured into separate schedules for DDT&E with options for production of additional spacecraft and sustaining engineering. During DDT&E, NASA will use an end-item cost-plus-award-fee incentive contract. This makes the award fee subject to final determination after the contractor has demonstrated that it meets the technical, cost, and schedule requirements of the contract.

DDT&E work is estimated to occur from Sept. 8, 2006, through Sept. 7, 2013. The estimated value is $3.9 billion.

Production and sustaining engineering activities are contract options that will allow NASA to obtain additional vehicles as needed. Delivery orders over and above those in the DDT&E portion will specify the number of spacecraft to be produced and the schedule on which they should be delivered.

Post-development spacecraft delivery orders may begin as early as Sept. 8, 2009, through Sept. 7, 2019, if all options are exercised. The estimated value of these orders is negotiated based on future manifest requirements and knowledge gained through the DDT&E process and is estimated not to exceed $3.5 billion.

Sustaining engineering work will be assigned through task orders. The work is expected to occur from Sept. 8, 2009, through Sept. 7, 2019, with an estimated value of $750 million, if all options are exercised.

http://www.nasa.gov/home/hqnews/2006..._contract.html

More info:
http://www.nasa.gov/mission_pages/co...ion/index.html
__________________
"Besides, the atheist non-god is not going to send me to non-hell for my lapse of non-faith if it should turn out that I am mistaken." - John C. Wright
Reply With Quote
  #2  
Unread 09-01-2006, 10:44 AM
KG_Norad's Avatar
KG_Norad KG_Norad is offline
Unteroffizier
 
Join Date: Sep 2005
Location: Colorado
Posts: 435
Send a message via MSN to KG_Norad
Default

Cool I better start getting in shape!
__________________


"Death is nothing, but to live defeated and inglorius is to die daily" - Napoleon Bonaparte.
Reply With Quote
  #3  
Unread 09-01-2006, 12:11 PM
KG_GASXTREME KG_GASXTREME is offline
Unteroffizier Offizier- anwarter
 
Join Date: Jan 2005
Location: Wherever Life Takes Me
Posts: 556
Send a message via ICQ to KG_GASXTREME Send a message via AIM to KG_GASXTREME Send a message via MSN to KG_GASXTREME Send a message via Yahoo to KG_GASXTREME Send a message via Skype™ to KG_GASXTREME
Default

Very exciting! I wonder if they will be building it at the Lockheed Martin plant down here in Georgia! :)
-steve
__________________
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:33 AM.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.